Key Takeaways
- Expert insights on texas adu laws 2026: complete guide to building accessory dwelling units in houston, dallas, austin, and san antonio
- Actionable strategies you can implement today
- Real examples and practical advice
Texas ADU Laws 2026: Complete Guide to Building Accessory Dwelling Units in Houston, Dallas, Austin, and San Antonio
Texas cities have increasingly embraced accessory dwelling units (ADUs) as solutions to housing affordability challenges, though regulations vary dramatically by city. Understanding your specific city's ADU requirements is essential for successful development.
This comprehensive guide covers ADU regulations, costs, and strategies for Texas's four largest cities: Houston, Dallas, Austin, and San Antonio, plus statewide considerations for building granny flats and backyard cottages.
What Are ADUs in Texas?
Accessory dwelling units—also called granny flats, in-law units, backyard cottages, or secondary units—are self-contained residential dwellings on the same lot as a primary residence.
Common ADU Types in Texas
Detached ADU:
- Separate structure from main house
- Maximum privacy
- Typically 400-1,200 sq ft
- Most expensive option
Attached ADU:
- Addition connected to main house
- Shares wall with primary residence
- Integrated utilities
- More cost-effective
Garage conversion:
- Convert existing [garage to living space](/blog/heloc-for-garage-conversion)
- Maintains garage footprint
- Most affordable option
- Fastest to complete
Above-garage apartment:
- Second-story addition above existing garage
- Popular in urban areas
- Good use of vertical space
- Maintains parking
Texas Statewide ADU Considerations
Texas doesn't have statewide ADU regulations—rules are set at the city level, creating significant variation across municipalities.
Property Rights and Deed Restrictions
Key Texas considerations:
HOA restrictions:
- Many Texas HOAs prohibit ADUs
- Review CC&Rs carefully before purchasing or building
- Some older neighborhoods have expired deed restrictions
- Restrictive covenants enforced through civil lawsuits
Municipal utility districts (MUDs):
- Common in suburban Houston and other metro areas
- May have additional restrictions
- Impact fees and utility capacity considerations
Deed restrictions:
- Private deed restrictions common in Texas
- May prohibit ADUs even if city allows
- Research title thoroughly
- Some restrictions expire after time periods
Texas Building Code
Texas follows modified International Residential Code (IRC):
- Adopted with state amendments
- Local jurisdictions may have additional requirements
- Energy code compliance (IECC)
- Accessibility considerations
Utility Connections
Water and sewer:
- Separate meter typically not required
- Can share with main house
- Check with local utility provider
- May require capacity verification
Electric:
- Check with local utility
- Separate meter may be optional or required depending on city
- Panel capacity considerations
Houston ADU Regulations
Houston has relatively permissive ADU regulations compared to other major Texas cities.
Basic Requirements
Eligible properties:
- Single-family residential lots
- Minimum lot size: 3,500 sq ft (typical)
- Zoning allows residential use
Unit size:
- Maximum: 1,200 sq ft OR 40% of main house, whichever is greater
- Minimum: No minimum specified
- Two bedrooms maximum (in most cases)
Lot coverage:
- Maximum 60-65% total lot coverage (main house + ADU + other structures)
- Varies by zoning category
Setbacks:
- Rear: 5 feet minimum
- Side: 5 feet minimum
- Front: Must be behind front building line of main house
- Alley: 3 feet minimum
Height:
- Maximum 35 feet (typical residential)
- May vary by zoning district
- Two stories allowed in most areas
Parking:
- One off-street parking space required for ADU
- Must be shown on site plan
- Driveway approach may be required
Houston ADU Process
Step 1: Verify deed restrictions and HOA rules
- Title company can research deed restrictions
- Review HOA documents
- Confirm no private restrictions
Step 2: Design and plans
- Hire architect or designer
- Ensure compliance with zoning and building code
- Site plan showing setbacks and parking
- Floor plans with dimensions
Step 3: Submit building permit
- Houston ePlan system online
- Submit complete plan set
- Site plan
- Structural calculations (if required)
- Energy code compliance documentation
Step 4: Plan review
- Typical review: 2-4 weeks
- Respond to comments if needed
- Resubmit corrected plans
Step 5: Permit issuance
- Pay permit fees
- Receive approved plans
- Post permit on site
Step 6: Construction and inspections
- Schedule inspections at required stages
- Foundation, framing, rough-in, final
- Final inspection and certificate of occupancy
Timeline: 4-8 months typical from design to completion
Houston ADU Costs
Construction costs:
- Detached ADU: $150,000-$300,000 (600-1,200 sq ft)
- Garage conversion: $60,000-$120,000
- Cost per square foot: $250-$300/sq ft average
Permitting and fees:
- Building permit: $1,500-$5,000 (based on valuation)
- Impact fees: Limited in Houston
- Plan review: Included in permit fee
- Inspections: Included
Houston ADU Benefits
Rental income potential:
- Inner Loop: $1,200-$1,800/month
- Heights/Montrose: $1,400-$2,200/month
- Energy Corridor: $1,000-$1,500/month
- Suburban areas: $900-$1,400/month
Property value increase:
- Typical increase: 15-25%
- Strong rental market demand
- Desirable for multigenerational families
Austin ADU Regulations
Austin has some of the most progressive ADU regulations in Texas, with continuous updates to increase housing supply.
Basic Requirements
See our complete California ADU guide for comparison—Austin's rules share some similarities.
Eligible properties:
- Any single-family residential lot
- No minimum lot size required (major change from previous rules)
Unit types allowed:
- One detached ADU
- One attached ADU
- One internal ADU (within main house)
- Can have multiple types on same lot
Unit size:
- Detached: Up to 1,100 sq ft
- Attached: Up to 1,100 sq ft OR 50% of main dwelling, whichever is larger
- Internal: Up to 1,100 sq ft
Setbacks:
- Rear and side: 5 feet minimum
- Front: Behind main house
- Alley: 5 feet minimum
Height:
- 15 feet maximum (one story appearance)
- 25 feet if designed as clearly subordinate to main house
Parking:
- No parking required for ADU (major advantage)
- Unless in specific overlay districts
Owner-occupancy:
- Currently not required (suspended through 2030)
- May return in future—monitor regulations
Austin ADU Process
Streamlined approval:
- Ministerial approval (no discretionary review)
- 60-day approval timeline mandated
- Online application through Austin Build + Connect
Pre-approved plans:
- City offers free pre-approved ADU plans
- Faster approval
- Reduced design costs
- Download from city website
Process:
- Design plans (or use pre-approved)
- Submit online building permit application
- 60-day review (faster if using pre-approved plans)
- Address comments if any
- Permit issued
- Construction and inspections
- Certificate of occupancy
Timeline: 3-6 months with pre-approved plans, 6-10 months custom design
Austin ADU Costs
Construction costs:
- Detached ADU: $200,000-$350,000 (600-1,100 sq ft)
- Garage conversion: $80,000-$150,000
- Cost per square foot: $300-$350/sq ft average (high due to Austin market)
Permitting:
- Building permit: $2,000-$6,000
- Impact fees: Reduced or waived for ADUs under 750 sq ft
- Water/wastewater: Limited fees for ADUs
Austin ADU Benefits
Rental income potential:
- Central Austin: $1,500-$2,800/month
- East Austin: $1,400-$2,200/month
- South Austin: $1,400-$2,200/month
- North Austin: $1,200-$1,800/month
Strong demand:
- University of Texas students
- Young professionals
- Tech workers
- Housing shortage drives demand
See our Austin short-term rental guide if considering STR use (note: ADUs cannot be STRs <30 days in Austin).
Dallas ADU Regulations
Dallas has made significant strides in permitting ADUs, especially in recent years.
Basic Requirements
Eligible properties:
- Single-family residential lots
- Minimum lot size varies by zoning (typically 5,000-7,000 sq ft)
Unit size:
- Maximum 1,200 sq ft OR 50% of main dwelling, whichever is less
- Two bedrooms maximum
Lot coverage:
- Maximum 50% total lot coverage (varies by zoning)
- Includes main house + ADU + other structures
Setbacks:
- Rear: 5 feet minimum
- Side: 5 feet minimum (one side), 8 feet opposite side
- Front: Behind main house building line
Height:
- 24 feet maximum typical
- Varies by zoning district
Parking:
- One off-street space required for ADU
- Shown on site plan
- Driveway standards apply
Owner-occupancy:
- Owner must occupy either main house OR ADU
- [Homestead exemption](/blog/homestead-exemption-guide) verification
Dallas ADU Process
Step 1: Verification
- Confirm zoning allows ADUs
- Check lot size meets minimum
- Review deed restrictions and HOA rules
Step 2: Design and site plan
- Hire architect or designer
- Site plan showing setbacks, parking, structures
- Elevation drawings
- Floor plans
Step 3: Submit application
- Online through Dallas Development Services
- Complete plan set
- Site plan
- Structural calculations (if required)
Step 4: Review
- Plan review: 4-6 weeks typical
- Respond to comments
- Resubmit if needed
Step 5: Permit and construction
- Pay permit fees
- Construction
- Required inspections
- Certificate of occupancy
Timeline: 6-10 months total from design to completion
Dallas ADU Costs
Construction costs:
- Detached ADU: $160,000-$280,000 (600-1,000 sq ft)
- Garage conversion: $70,000-$130,000
- Cost per square foot: $250-$280/sq ft average
Permitting:
- Building permit: $1,500-$4,000
- Plan review: Included
- Impact fees: Varies by location
Dallas ADU Benefits
Rental income potential:
- Uptown/Oak Lawn: $1,400-$2,200/month
- East Dallas: $1,200-$1,800/month
- North Dallas: $1,100-$1,700/month
- Suburban areas: $900-$1,400/month
Market demand:
- Growing city with strong job market
- Rental demand high
- Multigenerational housing trend
San Antonio ADU Regulations
San Antonio has expanded ADU allowances to address housing needs.
Basic Requirements
Eligible properties:
- Single-family residential lots
- Minimum lot size: 7,000 sq ft (typical)
- Varies by zoning district
Unit size:
- Maximum 1,200 sq ft
- Cannot exceed size of main dwelling
Setbacks:
- Rear: 10 feet minimum (or existing, whichever is less)
- Side: 5 feet minimum
- Must be behind front building line of main house
Height:
- 24 feet maximum (varies by district)
- Two stories allowed in most zones
Parking:
- One off-street space required for ADU
- Must meet driveway standards
Owner-occupancy:
- Owner must reside on property (main house or ADU)
- Verified through homestead exemption
Design standards:
- Compatible architectural style with main house encouraged
- Materials and colors should complement
San Antonio ADU Process
Process:
- Pre-application meeting (optional but recommended)
- Design plans meeting code requirements
- Submit building permit application
- Plan review (4-6 weeks)
- Address comments
- Permit issuance and pay fees
- Construction and inspections
- Certificate of occupancy
Timeline: 6-10 months typical
San Antonio ADU Costs
Construction costs:
- Detached ADU: $120,000-$240,000 (600-1,000 sq ft)
- Garage conversion: $60,000-$110,000
- Cost per square foot: $200-$240/sq ft average (lower than other major Texas cities)
Permitting:
- Building permit: $1,200-$3,500
- Fees generally lower than Austin/Dallas
- Impact fees vary by area
San Antonio ADU Benefits
Rental income potential:
- Downtown/Southtown: $900-$1,400/month
- Alamo Heights: $1,000-$1,600/month
- Stone Oak: $950-$1,400/month
- Suburban areas: $750-$1,100/month
Affordability advantage:
- Lower construction costs than other major Texas cities
- Lower property taxes than Austin
- Good ROI potential
Texas ADU Financing Options
[Home Equity Line of Credit](/blog/best-heloc-lenders-2026) (HELOC)
Best for: Most flexible financing option
Terms:
- Borrow against home equity
- Interest-only draw period
- Rates currently 7-10%
- Access funds as needed during construction
HonestCasa offers competitive HELOC rates for Texas ADU construction.
[Cash-Out Refinance](/blog/cash-out-refinance-guide)
Best for: Low existing mortgage rate, need large lump sum
Terms:
- Replace existing mortgage with larger loan
- Access difference in cash
- Fixed rate options
- Single monthly payment
Considerations:
- Only makes sense if current rate is similar to new rate
- Refinancing costs (2-3%)
- Extends loan term
[Construction Loan](/blog/construction-loan-guide)
Best for: Building from ground up
Terms:
- Short-term loan for construction phase
- Interest-only during construction
- Funds disbursed in draws as work progresses
- Convert to permanent loan or pay off at completion
Typical terms:
- 12-18 month term
- Higher interest rates (8-12%)
- Detailed budget required
- Inspections before draws
Personal Loan
Best for: Smaller ADUs or garage conversions
Terms:
- Unsecured financing
- $50,000-$100,000 typical max
- Fixed rate and term
- Fast approval
Considerations:
- Higher interest rates (10-18%)
- Lower loan amounts
- Shorter terms increase monthly payment
FHA Title 1
Best for: Smaller improvement projects
Terms:
- Up to $25,000
- No equity required
- Fixed rate
- Limited to smaller projects
ADU Design Considerations for Texas Climate
Heat Management
Essential features:
- High-efficiency HVAC (14 SEER+ minimum)
- Proper insulation (R-30+ attic, R-13+ walls)
- Energy-efficient windows (Low-E coating)
- Adequate shade (covered porches, trees)
- Light-colored roofing materials
- Ceiling fans in all rooms
Energy savings:
- Lower utility bills
- Improved comfort
- Essential in Texas heat
Outdoor Living Space
Highly valued in Texas:
- Covered patio or porch
- Ceiling fans on porches
- Outdoor kitchen potential
- Fire pit areas
- Landscaping for shade
Benefits:
- Extends living space
- Increases rental appeal
- Outdoor entertaining
Storm Considerations
Hurricane zones (coastal areas):
- Impact-resistant windows and doors
- Reinforced roof connections
- Proper drainage
- Flood elevation requirements (if in flood zone)
Tornado risk (North Texas):
- Safe room or shelter consideration
- Reinforced construction
- Impact-resistant materials
Water Management
Texas drought considerations:
- Drought-tolerant landscaping
- Efficient irrigation (drip systems)
- Rainwater harvesting potential
- Native plants
Drainage:
- Proper grading away from structure
- Gutters and downspouts
- French drains if needed
ADU Property Management
Renting Your Texas ADU
Setting rent:
- Research comparable ADU/small home rentals
- Consider location, finishes, amenities
- Include utilities or separate billing
- Adjust for market conditions
Marketing:
- Zillow, Apartments.com, Facebook Marketplace
- Local university housing boards (near campuses)
- Craigslist
- Word of mouth
[Tenant screening](/blog/best-property-management-software-2026):
- Rental application
- Credit check (minimum 600 score recommended)
- Income verification (3x rent)
- Employment and rental history
- Background check
Texas Landlord-Tenant Law
Key requirements:
- Written lease agreement
- Security deposit limit: No state limit, but must be reasonable
- Security deposit return: 30 days
- Required disclosures (lead paint, mold, smoking policy)
- Entry notice: Reasonable notice (typically 24 hours)
Eviction process:
- 3-day notice for non-payment
- Justice court eviction proceedings
- Must follow legal process
Fair Housing laws apply:
- Cannot discriminate based on protected classes
- Familiarize yourself with requirements
Property Management Option
Professional management:
- Typical fee: 8-10% of monthly rent
- Handles tenant screening, rent collection, maintenance
- Best for out-of-town owners or busy landlords
- Research local ADU-experienced managers
Tax Implications of Texas ADUs
Property Taxes
Reassessment:
- ADU construction increases property value
- Triggers reassessment of property
- Property taxes increase based on added value
Example:
- Current assessed value: $350,000
- ADU adds $150,000 value
- New assessed value: $500,000
- Tax rate: 2.5% (combined city/county/school)
- Annual tax increase: $3,750
Texas property tax considerations:
- Relatively high property tax rates (2-3% typical)
- No state income tax offsets this
- Factor into ADU financial analysis
Homestead Exemption
Main residence homestead:
- Homestead exemption applies to combined property (main house + ADU)
- School district exemption: $100,000 minimum
- County/city exemptions: Varies
- Age 65+ additional exemptions
Owner-occupancy preservation:
- Renting ADU doesn't affect homestead
- Must occupy main house or ADU (city-specific)
Rental Income Taxation
Federal income tax:
- Rental income fully taxable
- Deductible expenses: repairs, maintenance, insurance, property tax (proportional), depreciation
- Depreciate ADU structure over 27.5 years
Example:
- ADU construction cost: $180,000
- Depreciable basis: $165,000 (excluding land)
- Annual depreciation: $6,000
No state income tax:
- Texas advantage: no state income tax on rental income
- Federal tax still applies
Comparing Texas Cities for ADU Investment
| City | Min Lot Size | Max ADU Size | Parking Req | Owner-Occ | Est. Construction Cost | Est. Rent |
|---|---|---|---|---|---|---|
| Houston | 3,500 sf | 1,200 sf or 40% | 1 space | No | $150-300K | $900-2,200 |
| Austin | None | 1,100 sf | None | No (temp) | $200-350K | $1,200-2,800 |
| Dallas | 5,000-7,000 sf | 1,200 sf or 50% | 1 space | Yes | $160-280K | $900-2,200 |
| San Antonio | 7,000 sf | 1,200 sf | 1 space | Yes | $120-240K | $750-1,600 |
Best for ADU investment:
- Houston: Flexible regulations, no owner-occupancy requirement
- Austin: Highest rents, no parking requirement, strong demand
- Dallas: Balanced regulations, strong rental market
- San Antonio: Lowest costs, good ROI potential
Conclusion
Texas cities offer diverse ADU opportunities, each with distinct regulations and market dynamics. Houston and Austin provide the most permissive regulations, while Dallas and San Antonio require more careful navigation of zoning and lot requirements.
Before building an ADU in Texas:
- Research your specific city's regulations thoroughly
- Verify no HOA or deed restrictions prohibit ADUs
- Obtain accurate cost estimates from local contractors
- Analyze rental market and potential income
- Secure appropriate financing
- Work with experienced local professionals
Whether you're seeking rental income, multigenerational housing, or [property value appreciation](/blog/best-cities-appreciation-2026), ADUs offer compelling opportunities in Texas's growing cities. With proper planning and execution, your ADU can provide decades of value and flexibility.
For homeowners considering financing options for ADU construction, HonestCasa offers specialized HELOC solutions designed for home improvement projects throughout Texas.
Related Articles
- California ADU Regulations: Complete 2026 Guide
- ADU Building Guide: Planning Your Accessory Dwelling Unit
- Austin Short-Term Rental Regulations 2026
- [Houston [Real Estate Investment](/blog/dscr-loan-fix-and-flip) Guide](/blog/houston-real-estate-investment-guide)
- HELOC for Home Improvements: Complete Financing Guide
Get more content like this
Get daily real estate insights delivered to your inbox