ADU Permitting Timeline by State: How Long Does It Really Take?

ADU Permitting Timeline by State: How Long Does It Really Take?

ADU permitting timelines vary dramatically by state and city. Here's a state-by-state breakdown of what to expect, how to speed up the process, and how to finance your ADU while you wait.

February 17, 2026

Key Takeaways

  • Expert insights on adu permitting timeline by state: how long does it really take?
  • Actionable strategies you can implement today
  • Real examples and practical advice

ADU Permitting Timeline by State: How Long Does It Really Take?

One of the most common shocks for [homeowners](/blog/home-insurance-savings) pursuing an ADU ([Accessory Dwelling Unit](/blog/multigenerational-housing-guide)) project is how long the permitting process takes. Contractors quote 3–6 months to build your unit. Nobody tells you it could take another 3–12 months just to get your permits.

Understanding permitting timelines before you start planning—and budgeting—can save you enormous frustration and help you line up financing at the right moment.


Why Permitting Timelines Vary So Dramatically

ADU permitting isn't controlled at the federal or state level (except in [California](/blog/california-heloc-guide), which has enacted sweeping state preemptions). It's controlled by local jurisdictions—cities, counties, and special planning districts—each with their own:

  • Staffing levels for plan review
  • Zoning complexity and overlay districts
  • ADU ordinance age (new ordinances mean untrained staff)
  • Public comment requirements
  • Historic preservation review requirements
  • Flood zone and environmental review triggers

A city like Austin, TX has dedicated ADU staff and streamlined review. A small rural county in the Midwest may have never processed an ADU permit before and lacks the capacity.


California: The National ADU Leader

California has done more than any other state to reduce ADU permitting barriers. Key laws:

  • AB 68 (2019): Eliminated owner-occupancy requirements, reduced setbacks, removed parking replacement mandates
  • SB 13 (2019): Capped ADU permit fees for smaller units
  • AB 3182 (2020): Required HOAs to allow ADUs in most circumstances
  • AB 345 (2021) / SB 897 (2022): Further streamlined provisions for multi-family ADUs, reduced setbacks for ADUs near public transit

California-mandated permit timeline: Cities must act on ADU permit applications within 60 days. If they don't, the permit is deemed approved. This is a hard statutory deadline—many cities struggle to meet it, but applicants can enforce it.

Real-world timelines by California city:

CityReported ADU Permit Timeline (2025–2026)
Los Angeles3–5 months (LADBS has online ADU pre-approvals)
San Diego2–4 months
Sacramento6–10 weeks
San Jose2–3 months
Oakland3–5 months
San Francisco5–9 months (complex historic overlays)
Fresno4–6 weeks
Riverside6–10 weeks

California ADU Regulations: Complete Guide → California ADU Regulations 2026


Oregon

Oregon passed HB 2001 (2019), allowing duplexes and ADUs in most residential zones statewide. Portland has been an ADU leader since 2010.

Permit timelines:

CityADU Permit Timeline
Portland2–4 months (well-established ADU program)
Eugene6–10 weeks
Bend2–4 months
Salem8–12 weeks

Portland's Bureau of Development Services has ADU-specific reviewers and a streamlined process. Small cities in Oregon may take longer.


[Washington](/blog/washington-heloc-guide) State

Washington allows ADUs statewide through the Growth Management Act, but implementation varies by jurisdiction.

CityADU Permit Timeline
Seattle3–6 months (DADU program has dedicated reviewers)
Tacoma2–4 months
Bellevue3–5 months
Spokane6–10 weeks
Olympia8–14 weeks

Seattle's DADU (Detached ADU) program is mature and well-documented. The city offers pre-application conferences and standard plan libraries to speed up review.


Texas

Texas has no statewide ADU law—ordinances are entirely local. Results vary dramatically.

CityADU StatusPermit Timeline
AustinADUs permitted citywide; streamlined6–12 weeks
HoustonADUs permitted; minimal zoning code4–8 weeks
DallasADUs permitted in most zones8–14 weeks
San AntonioLimited ADU provisions2–4 months
Fort WorthADUs permitted with conditions8–14 weeks

Texas ADU Regulations → Texas ADU Regulations Guide


New York

New York State passed a law in 2022 allowing ADUs in single-family zones statewide—but implementation is uneven. NYC has its own complex code.

JurisdictionADU Permit Timeline
New York City6–18+ months (DOB review is notoriously slow)
Westchester County4–8 months
Albany3–5 months
Buffalo2–4 months
NYC (pre-approved ADU designs)4–6 months (new fast-track program)

NYC ADU Regulations → NYC ADU Regulations Guide


Florida

Florida allows ADUs statewide under HB 1339 (2023), which requires cities to allow ADUs as a matter of right in most residential zones.

CityADU Permit Timeline
Miami3–5 months
Orlando6–10 weeks
Tampa8–12 weeks
Jacksonville6–10 weeks
Boca Raton2–4 months

Florida's ADU law is relatively new, and many cities are still updating their ordinances to comply. Expect some friction in smaller jurisdictions.

Florida ADU Laws → Florida ADU Laws Guide


Colorado

Colorado passed SB 23-213 (2023), requiring cities over 1,000 people to allow ADUs in most residential zones.

CityADU Permit Timeline
Denver2–4 months (mature ADU program)
Boulder3–5 months
Colorado Springs6–10 weeks
Fort Collins8–12 weeks
Aurora6–10 weeks

Denver's ADU-specific reviewers and online portal have made it one of the more efficient cities in the Mountain West.


States With Limited ADU Access (Slower Permitting)

StateStatusTypical Timeline
GeorgiaLocal control; Atlanta allows ADUs3–6 months in Atlanta
VirginiaLocal control; Northern VA allows ADUs2–5 months
MinnesotaMinneapolis mandates; outstate variable3–6 months
IllinoisChicago allows ADUs; suburban varies4–8 months
PennsylvaniaLocal control; Pittsburgh and Philadelphia allow3–6 months
ArizonaStatewide ADU law passed 2022; cities adapting2–4 months

How to Speed Up Your ADU Permit

Regardless of your jurisdiction, these strategies reduce wait times:

1. Use Pre-Approved Standard Plans

An increasing number of cities offer pre-approved ADU plan libraries where homeowners can select from already-reviewed designs, skipping the plan review step (or dramatically shortening it). Check your city's planning department website.

Cities with pre-approved ADU plans: Los Angeles, San Jose, Berkeley (CA), Austin, Portland, Seattle.

2. Hire an Architect or Designer with Local Experience

Permit rejections and revision requests are the biggest timeline killers. A designer who has successfully permitted ADUs in your specific city knows exactly what reviewers look for—dramatically reducing the number of revision cycles.

3. Submit a Complete Application

Incomplete applications are returned without review—restarting your clock. Hire a permit expediter or architect to review your application before submission.

4. Request Pre-Application Consultation

Most planning departments offer a pre-application meeting (free or low-cost) where a planner reviews your concept and identifies potential issues before you invest in full drawings. Use this.

5. Monitor Your Application Status

Don't assume your application is being reviewed. Contact the permit office weekly after submission to confirm receipt, check status, and respond immediately to any requests for additional information.


Financing While You Wait for Permits

Here's a common scenario: your HELOC is approved, your plans are ready, but permits take 3–4 months. How do you manage?

Good news: Most HELOCs have a 10-year draw period. You don't need to draw until you need to pay. If permits take 4 months, you simply don't draw until construction begins—and you pay no interest on undrawn funds.

Strategies:

  • Open your HELOC during the planning/permitting phase (before construction bids)
  • Don't draw until you're ready to pay the [contractor](/blog/diy-vs-contractor)'s first invoice
  • Use the permitting window to finalize contractor selection and pricing

See [[HELOC for ADU](/blog/heloc-for-adu-construction) Construction](/blog/heloc-for-adu-construction) for how to structure your draw schedule.


Common Permit Rejection Reasons (And How to Avoid Them)

Setback violations: Your proposed ADU is too close to a property line. Solution: verify setback requirements before designing.

Insufficient ceiling height: Plans show 6'8" finished ceiling; code requires 7'. Solution: check code requirements before starting drawings.

Inadequate natural light: Window area doesn't meet the required percentage of floor area. Solution: add windows in planning.

Missing required documents: Fire sprinkler calculations, engineer's structural letter, energy compliance (Title 24 in CA). Solution: have your architect compile a full checklist before submitting.

Non-compliant kitchen (JADU): Junior ADUs have specific kitchen requirements. Solution: verify JADU-specific code requirements in your jurisdiction.


Related Articles


Bottom Line

ADU permitting timelines range from 6 weeks in a well-organized Texas city to 18 months in a complex urban jurisdiction. The most important things you can do: hire a designer with local permitting experience, submit a complete application, and use pre-approved plans where available.

Finance your ADU with a HELOC—open it during the permitting phase so it's ready to draw the moment construction begins. Check your HELOC eligibility at HonestCasa and keep your ADU timeline on track from day one.

Get more content like this

Get daily real estate insights delivered to your inbox

Ready to Unlock Your Home Equity?

Calculate how much you can borrow in under 2 minutes. No credit impact.

Try Our Free Calculator →

✓ Free forever  •  ✓ No credit check  •  ✓ Takes 2 minutes

Found this helpful? Share it!

Ready to Get Started?

Join thousands of homeowners who have unlocked their home equity with HonestCasa.